Description
Ensure full legal compliance with the Kewtech TC1 Electrical Installation Certificate. This book is specifically designed for new installations, including domestic, commercial, and light industrial work. It features a clear, structured layout that simplifies the documentation process.
The TC1 serves as the “base” certificate and includes the necessary Schedule of Inspections. For a complete installation record, simply use this book alongside the TC5 (up to 12 ways) or TC6 (over 12 ways) test result schedules.
Kewtech has optimized this pad for ease of use in the field. Specifically, the no-carbon-required (NCR) paper ensures that your handwriting transfers clearly to the duplicate copy. By choosing Kewtech, you guarantee that your certification meets the latest 18th Edition wiring regulations.
Key Benefits:
-
Fully Compliant: Meets the latest BS 7671:2018 Amendment 2 requirements.
-
Professional Finish: Provides a clean, official document for your clients.
-
Duplicate Copies: Includes 13 certificates per book with instant carbon copies for your files.
-
Saves Time: The pre-printed schedule of inspections reduces the need for manual writing.
-
Portable Design: The durable A4 landscape pad is easy to carry and use on-site.
Technical Specifications
| Feature | Specification |
| Manufacturer | Kewtech |
| Product Code | TC1 |
| Installation Type | New Electrical Installations |
| Max Supply Rating | 100A |
| Compliance | BS 7671:2018+A2:2022 |
| No. of Certificates | 13 Certificates per book |
| Format | Duplicate Carbon Copy (NCR) |
| Paper Size | A4 |
| Includes | Schedule of Inspections |
| Required Extras | Must use with TC5 or TC6 Test Schedules |




